亚洲福利不卡片在-亚洲浮力影院久久久久久-亚洲风情中文-亚洲风情亚aⅴ在线发布-亚洲丰满熟女一区二区蜜桃-亚洲丰满熟女一区

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 17294

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 亚洲国产精品一级无码中文字 | 欧美日韩黄色网站在线免费 | 亚洲中文字幕在线第六区 | aa级毛片毛片免费观看久 | 国产精品第三页在线看 | 久久久精品日韩免费观看 | 一级做a爰片久久免费 | 国产精品1024香蕉在线观看 | 久久精品一区二区无码AV | 国产精华液一线二线三线 | 日本黄色片网站 | 亚洲国产精品一区二区第四页 | 波多野结衣xfplay在线观看 | A片放荡少妇高潮喷水小说 a片疯狂做爰全过的视频 | 婷婷我也去俺也去狠狠爱 | 女人把腿张开叫男人桶免费视频 | 久久九九免费看少妇高潮A片 | 国产亚洲精品午夜高清影院 | 在线观看视频网站色 | 国产三级高清视频在线观看 | 国产三级a三级三级野外 | 国产精品亚洲精品久久国语 | 好想被狂躁A片免费无码 | 91精品导航在线网址 | 欧美社区一区二区 | 欧美一级特黄aaaaaa在线看首页 | 精品视频高清无码一区 | 人妻小说欧美中文字幕亚洲乱码熟女 | 久久草草亚洲蜜桃臀 | 国模粉嫩小泬视频在线观看 | 亚洲中文字幕无码天然素人 | 天堂久久精品9966国产精品一区在线观看你懂的 | 欧美激情中文字幕一区二区 | 精品丰满人妻无套内射 | 91视频国内自拍 | 国产产免费av片 | 亚洲精品做爰无码片麻豆 | 亚洲精品国产摄像头 | www.久久精品视频 | 久久88台湾三级香港三级 | 无码不卡毛片视频免费播放 |